10-30-06
Plumbing fixtures! The sink and toilet from the kid bath:


The Tea Green pedistel sinks in the spa. How many people have a
picture of the bottom of their toilet?



The nice angle-stops (they have the H/C that go in the center), and the
funky faucet.

10-24-06
The shower unit nearly installed:
10-23-06
An overall view with the driveway apron, lights & column bases.

Lighting!
Front entry, stairs, bedroom, front hall, kid bath, pantry,
spa.






The single light switch on the left is in our pantry. We don't know what
it does.... and, well, neither does the electrician. I'm sure we'll figure
it out eventually.

10-22-06
Paint! The lighter color in my sewing room - which I like, the Latte color
in the Kid Bedroom and the Shale Blue/Outside trim color Gray mix that Mark did
for his workshop, AKA the Maple Leaf room.



The view from my sewing room window. The view of the changing leaves
is breathtaking.

The insides of our Waterhaven shower unit. It's got alot going on
inside, including some large pipes.

10-19-06
The beginnings of our deck, courtesy of Sage, our framer.

The dark chocolate & capuccino colors in the master bedroom.
The initial color in the sewing room, which I think is too dark, so we cut the
color by 50%, we'll see how that looks.


Our makeshift security system.

10-17-06
Our front columns - stage one, the installed garage doors, and my very first
garage door opener.



The cappuccino paint color in the bedroom:

Our future deck:
10-16-06
The finished trim paint job. Interior paint next!

Mark working on the doors, the doors before, and the doors after they were
painted.


10-11-06
Ladies & Gentlemen, we have primer:


Some of the organizing that Mark & Hilde did on Monday:

The art niche in the bedroom, and the door from the mud room to the
garage. The door was flat earlier in the day and Mark made it match our
other doors.

10-8-06
Mark, Hilde (Mark's mum) and I spent the day at the house cleaning up.
Compare this one with the great room photo from yesterday.
10-7-06
The current view of the great room, all messy and masked off.

The finished millwork on my tub, waiting for paint:

The doors all accordian-ed in the basement, and you can see the front
door:


Would you pay 3/4s of a million for this house?
10-3-06
The masking work from the painters:



The new kitchen sink, and the original sink - see how the bar top would've
hung over it?


Mark's mark on the driveway:

The first time our apartment has been seen by anyone other than Mark &
I, in, oh, months. The packing continues!
10-2-06
Our garage doors, (2nd set to the left), and my installed tub handles.


Our bar stools... see, they match!