Plumbing is done, electrical is being worked on done, HVAC is
mostly done, gas
piping is pending done. Siding is mostly done.
Sprinkler are next!
3-30-06
The overall view w/ some of the siding showing on the front. A
continuation of the patio side view of the siding.


Our front door bell. 'C'mon in!'

The fire sprinkler covers, and here you can see the Kohler Tea Green color:

3-25-06
OK, so here are the knee-braces, Mark's workshop, and the knee braces up on the
house. Plus, me helping!




Our first electrical outlet:

Pictures of the siding, in progress, and the back side of the house is done:



The beautiful view of the trees and the sun shone through after a brief rain
shower.

3-19-06
The siding is starting, and you can see the double-doors into the work
shed. Plus, Mark with the first knee-brace he made. He's so proud.



3-12-06
Pictures of the my command the
lights in the electrical our
new
electrical,
center,
the kitchen,
panel,
transformer



Our front entry, the gas piping machine that threads the pipes, our two
tankless water heaters!!!! So cool!



More of the space oddity, you can also see the gas piping, water, and some
electrical in the first two photos.



3-03-06
Pictures of the Electrical work: light fixtures in the living room ceiling
and the electrical panel and a sampling of all the wiring:


HVAC pictures: see it's a space oddity in our downstairs, silver, black,
tubes, pipes.... a man in orange.



The view from the laundry room window: Just thought this was a nice
view of the front yard of the house.