We almost have 2/3rds a roof!!! Check out the progress!
1-29-06
A few interior shots that will show some of the interior progress:





The view of the mudroom from the garage door
The view of the front hall from the kid bedroom
The front door from the 2nd floor
The view of the spa from the closet
The master bedroom
1-27-06
The roof is 95% done and they've started the trusses along the front of the
house and between the garage and the house. And our windows were delivered
this morning!!!! All the way from Delta, B.C.


1-25-06
They're starting to cover the last part of the roof. Then they have to
work on the section between the garage and the main house (over the mud/panty
area).

1-22-06
Several shots of the house, with most of it's roof on. Also the view from
the top of the driveway showing some of the roofline details.


Our Christmas photo wasn't taken from the exact same angle as last year, and
here's the reason why. The photographer is standing on the same property
marker, but something else is standing right about where we stood a year ago. =]



1-2006
12-04
12-05
The same group of three trees are:
1-2006 - center of photo
1-2004 - top left of photo
1-2005 - top right of photo
1-15-06
Finally got down to the lower spot (#2) to take a picture. The house is looking
huge from this angle. We're starting to get a roof over the bedroom.
There is still a lake in my sewing room, but everyone says it will be OK.

1-12-06
The overall view showing that we are starting to get a roof.