The roof is almost finished and we have some windows!!
2-25-06
Some pictures of the plumbing - and no, they're not that exciting:
Kid bath Laundry
room Tub
filler
Powder Spa
Shower/ Tub &
Sink Downstairs
(white thing @ top)
Room Steamer





The furnace, once everything has been connected to it:
2-15-06
Our furnace, ducting, Mark & Cody working on it, the view inside the
ducting, the living room @ night.






Jobo (neighbor's dog), the studs at night, and the 'dry the house' equipment.



2-11-06
Overall picture from the different angle so you can see more:


Our new shower is about the same size as our current bathroom.
The beginnings of our kitchen island. I should probably mention that
the island is 'L' shaped, hence the one post being shorter than the others.

2-07-06
Overall picture: More roof, you can see three of the windows.

STAIRS!!!! From the main floor to the 2nd, and from the basement to the
main floor. Well most of this staircase has been there for quite a while,
except for the last three steps.


The front door before & after. Note the fascia (white board running
along edge of roof). In the before picture you can see that they run back
underneath the edges of the bottom of the gable (angled roof above front
door). This left no space for the columns that we'll have that go up to
the front corners of the gables, they'd run into that section of roof under the
gable. Plus, it really didn't look right.


Before
After
The first window, the stairs before they existed, the mess on the main floor
(kitchen).